The Heights, Charlton SE7

Value: £3,800,000
Client: Royal Borough of Greenwich
Duration: 97 weeks

Built of timber frame construction, The Heights comprise 13no. two storey blocks, with each block providing 6no. flats and one house. The project brief comprised major external refurbishment with residents in occupation.

Phase one of the project involved removing the entire external vertical asbestos cladding (under controlled conditions) and asbestos roof slates to each block via an enclosed sheeted scaffold with temporary roof over.

External refurbishment works included:

  • External Wall Insulation (EWI)
  • Fire separation
  • New roof covering and rainwater goods
  • Replacement windows
  • New aerial system
  • M&E interface adaptations
  • External decorations
  • Estate lighting
  • Drainage adaptations
  • Environmental works

  

Before                                          After